cristianmart29 cristianmart29
  • 04-04-2018
  • Computers and Technology
contestada

What action is often necessary when installing joists for a cantilever floor?

Respuesta :

idegollacion20
idegollacion20 idegollacion20
  • 14-04-2018
A cantilevered floor is a kind of floor that pops out past the foundation wall below.  Start the joist layout from the longest and strongest run the house or building has. You should also lay floor joists on the stairway's opposing side. Also, remember the 2/3 rule for framing cantilever joists. This means that twice the joist's length should remain inside the structure while the rest sticks out.
Answer Link

Otras preguntas

Select the best answer for the question. 15. What is the total of 49 1/4+3 3/8? A. 4578 B. 52 1/2 C. 4518 D.5258 O Mark for review (Will be highlighted on the r
What is the surface area of the prism?
State the domain and range of the relation {(1,2)8,16, (2,4), (4,8), (8,16)}
is this the right answer for number 12?
To the nearest tenth, which is the perimeter of △ABC?
7. How would you solve this equation: 9x = 153? * Multiply Divide Add Subtract
Describe the process of sowing of maize by a seed drill.
5x+1/3(3x+6)>14 solve for x
Sammy the school custodian is having a debate with Marci the museum curator. Sammy contends that the school is larger than the museum in terms of area. Marci co
Simplify expressions. 12x(x+2)−5(2x−1)