Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

You need to work out the area of each face: Purple: 1 x 4 + 5 x 2 (double it as we have the front and back) Red: 3 x 2 + 3 x 2 (double it as we have two sides)
What is the slope of a line perpendicular to a line that passes through (3,8) and (1,-4)? A. -1/6 B. -1/2 C. 2 D. 6
Each turbine can produce 10kw an hour. How much can these 4 produce in 1 day
Lance is tracking the progress of his plant's growth. Today the plant is 5 cm high. The plant grows 1.5 cm per day. Which equation below represents the height o
Which legislation passed by congress autherized the use of force in Vietnam​
I'll give brainliest In going through the three physical states of matter, water would normally undergo changes in A) composition. B) density. C) mass. D) we
You decide to use a battery labeled “205 mAh 1S” with a total voltage of 3.7 V. What is the overall energy capacity of the battery?
Please answer this correctly
Identify each example as either explicit or implicit detail.implicitExplicitlikeA text lists the physical features of a character's appearanceA text suggests bu
Is the following sentence a sentence beginning with a prepositional phrase? “Against the wall, I sat curled up in a ball like an armadillo, as a stream of tear