RoboticNaruto4693 RoboticNaruto4693
  • 03-01-2018
  • Physics
contestada

How much work is done when a hoist lifts a 290-kg rock to a height of 7 m?

Respuesta :

samuraijack
samuraijack samuraijack
  • 03-01-2018
Given: Mass m = 290 Kg;  Height  h = 7 m

Required: Work = ?

Formula: Work = Force x distance  but, Force F = mg

W= fd

W = mgh

W= (290 Kg)(9.8 m/s²)(7 m)

W = 19,894 Kg.m²/s²

W = 19,894  J




  
Answer Link

Otras preguntas

What is your rate in miles/hour if you tun at a speed of 2.2 miles in 20 minutes
What is one reason coral reefs are such diverse ecosystems?
What is the shaking or sliding of Earth’s surface called?
The question says, A baseball player reaches first base 30% of the times he is at bat. Out of 50 times at bat, about how many times will the player reach first
What is 72% as a fraction and decimal
Explain in your own words why the boundary between the African and Eurasian plates isn't clear.
Summarize the effects of shearing, compression, and tension on Earth's crust.
The length of a rectangle is 5 inches less than three times its width. The perimeter is 86 inches. Find the length and width. Write an equation and solve. Plea
American exceptionalism can best be defined as the belief that A.the United States could acquire territory by force because US troops were exceptional. B.the Un
A reason economic systems like sharecropping and the crop-lien system came to be was due to changes in the plantation system. What were they?