bryceisabeast3543 bryceisabeast3543
  • 02-09-2017
  • Business
contestada

Variances are calculated by subtracting the actual cost from ____

Respuesta :

thert68
thert68 thert68
  • 02-09-2017
Budgeted cost is the answer as by having the budget plan to compare to, the business, government agency, or non-profit organization can make adjustments to its management of costs or future budgets. 
Answer Link

Otras preguntas

in simplest form whats the ratio of 18 mins to 1.5 hours
What do astronomers mean when they say that the universe is isotropic?
Why did roosevelt want to assist the banking system
Which president made preventative war (which he called preemptive) the centerpiece of his foreign policy?
A roller-coaster car speeds down a hill past point a and then rolls up a hill past point b, as shown below. a. the car has a speed of 20.0 m/s at point a. if th
Which is an example of speed? Cindy biked westward at 30 km/h. A rock is to the left of a flowerpot. A dog runs an average of 8 mph. Leo lives 2 miles north o
Which is gramatically correct?"Even though when I was there,they would not have to spend extra money""Even though when I had been there, they would not have to
A parliamentary system experiences fewer conflicts between the executive branch and the legislative branch than does presidential system. Why?
One negative effect of society's need for energy would include
iodide-131 decays with half life of 8.02 d. In a Sample initially containing 5.00 mg of I 131, what mass remains after 6.01 d?