jhb7mi4leeaJanekitt jhb7mi4leeaJanekitt
  • 15-04-2017
  • Mathematics
contestada

A team of 15 workers can do a job in 7 hours. how long would this work take if the team has 35 people?

Respuesta :

taskmasters
taskmasters taskmasters
  • 27-04-2017
The concept used for this item is equating the man-hours for both scenario. Man-hour is calculated by multiplying the number of men working by the number of hours they need to finish the work. That is,
                            (15 men)(7 hours) = (35 men)(x hours)
The value of x from the equation is equal to 3. Therefore, it will only take 3 hours for 35 people to do the same job. 
Answer Link
jeremyhulu08 jeremyhulu08
  • 07-05-2020

Answer:

the answer will be 3 hours

Step-by-step explanation:

Answer Link

Otras preguntas

how do yo tell a fish is a boy or girl?
What did Americans value during the Enlightenment? how did these values shape their american dream?
the cost per minute of a conference phone call, originally $2.80, increased by 20%. What is the new price?
Who's wrong? I think the correct numbers would be 17 and 18, not 18 and 19.
I Believe George Washington Was A British Before He Was President Of The United States. Am I Right?
When was jessie j born?
Which statement best describes the law of conservation of energy? a. Energy can be destroyed but not created. b. We need to conserve our
What is the mass in grams of 85.32 mL of blood plasma with a density of 1.03 g/mL?
Does anyone know precalculus?
how far is Asia from Africa?