emelymartinez emelymartinez
  • 01-03-2017
  • Mathematics
contestada

An experienced carpenter could build a house in 5 days. How much would he have finished if he worked for 3 days?

Respuesta :

MIniNAchoz
MIniNAchoz MIniNAchoz
  • 01-03-2017
I think it would most likely be  3/5
Answer Link
snoopynfriends
snoopynfriends snoopynfriends
  • 01-03-2017
he would have 8 this is the answer
Answer Link

Otras preguntas

How is the Grand Canyon like a history book
Please help. What is the value of the expression when a = 3 and b = 2?     3a^3 + 2b^3A.78   B.97C.135  D.745
How to write 65 trillion
If z varies directly with the product of x and y (z=kxy), then z is said to vary jointly with x and yThe area of a triangle varies jointly with its base and hei
During the California Gold Rush of the 1850s, some Americans in the eastern part of the United States reached California by sailing all the way around South Am
Order these decimals from least to greatest  7.8,8.7,8.2,7.96,8.014
There are five types of grains of sand: very coarse, coarse, medium, fine, and very fine. A grain of fine sand can have a diameter of 0.125 millimeters. Which n
The Rectangular Field Is 2100 square feet the length is 50 feet the field is divided into 3 rectangles x ft, 3x ft and 2x ft write and solve the equation
how to write a sentence using dearth
Which plot structure is found commonly in fairy tales, folk tales, and myths?