A construction crew has just built a new road. It took them 8 weeks to build 10.24 kilometers of road. At what rate did they build the road?

Respuesta :

Aswanglol6
Aswanglol6 Aswanglol6
  • 15-09-2022

Answer:

Are you trying to figure out how long the road is?

10.24 km per week, times 4 weeks.

10.24 x 4 = 40.96

Step-by-step explanation:

Answer Link

Otras preguntas

Find the two numbers the quotient is between 191÷3
What was the unofficial motto of the Sons of Liberty?
What events in 2017 relates to the events that lead to the civil war of 1861?
Lee la frase y escribe el pretérito del verbo en paréntesis (¡OJO! Estos verbos tienen un cambio). Read the sentence and write the preterit of the verb in paren
How do evolutionary psychologists use natural selection to explain our human behavioral tendencies?
Which equation has solution x = -3? A) 2x - 7 = -1 B) 3x + 8 = 1 C) 1/2x + 8 = 10 D) 1/2 (2x - 6) = -6
One pound of swordfish costs as much as 1.5 pounds of salmon. Mrs. O pays $39 for 2 pounds of salmon and 3 pounds of swordfish. Find the ratio of the amount of
Find the coordinates of the midpoint of the segment connecting P(6, –6) and Q(–2, 7).
Which of these things did Shakespeare NOT do during his career?
2t+8 is greater or equal -4(t+1)