In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

V(t)=t2−3t what is the meaning of the quantity v(4) ?
What is the protagonists stage of identity development throughout the boy in the striped pajamas Beginning Middle End
BRAINLISTED! Read this line from the poem. And wake to the farm forever fled from the childless land. How does this image affect the poem? It highlights the des
When the variable religious affiliation is classified as protestant, catholic, and jewish, this variable has the important quality of being?
Is it illegal to tell someone to kill themselves?
compare and contrast the characteristics of the ocean and ocean water
The coordinates of the vertices of quadrilateral DEFG are D(−2, 5) , E(2, 4) , F(0, 0) , and G(−4, 1) . Which statement correctly describes whether quadrilater
The perimeter of a rectangle is 99 inches. It’s width is 11 inches. What is the length of the rectangle? Solve algebraically and arithmetically.
Why did Benjamin Franklin use the pseudonym “Richard Saunders” when writing Poor Richards Almanac?
Line GH contains points G(–2, 6) and H(5, –3). What is the slope of ?