preeshapatel09 preeshapatel09
  • 15-05-2022
  • Mathematics
contestada

Roadstone Limited can resurface 7/8km of a road in a day. How many days will it take
to resurface a road of length 14 km?

Respuesta :

profarouk profarouk
  • 15-05-2022

Answer:

16 days

Step-by-step explanation:

Let x be the number of days that it will take.

7/8 km per 1 day

14 km    per x day

We have to solve the equation:

[tex]\frac{x}{1} =\frac{14}{\left( \frac{7}{8} \right) }[/tex]

[tex]\Longrightarrow x=14\times \frac{8}{7} =2\times 8=16[/tex]

Answer Link

Otras preguntas

what region do scientists think may have once been a large sea
117,821 round to the nearest ten thousand
When 3.54 grams of phosphorus react with excess oxygen gas to produce diphosphorus pentoxide, the percent yield is 84.1%. What was the actual yield of the react
standard form of two hundred ten million sixty four thousand fifty
Circle the difference 9 - 4=5
Why did the partition of Africa create artificial boundaries?
4 1/3 divided by 2 1/3
Which way is the most casual way to greet a friend in Spanish
The four terrestrial planets that have solid, rocky surfaces are ?
how do I write 119,000,003 in word form