daosau2791 daosau2791
  • 04-03-2022
  • Business
contestada

When using the high-low method, if the high or low levels of cost do not match the high or low levels of activity, ______.

Respuesta :

haltefe
haltefe haltefe
  • 04-03-2022

Answer:

Choose the periods with the highest and lowest level of activity and their associated costs.

--

Hope this Helps!

Answer Link

Otras preguntas

On the basis of past experience, a contractor expects to find 4.5% Broken Brickson every truckload. If he orders 2000 and Briggs will he have enough to complete
BEST ESSAY: MARKED AS BRAINLIEST
Henry has a fenced yard in the shape of a rectangle with a perimeter that measures 226 feet. If the width of the yard measures 25 feet what is the length?
-2= 6/7x please help me
(5x^4)^2 solve this equation
briefly explain five contributory factors to most accidents in the world​
You are on a hike in the mountains. You have 4.5 km left to go before your next camp- site. The sun will set in 6.82 h. What average speed must you walk to get
how do mr birlings speeches at the start of the play support a capitalist viewpoint? PLEASE HELP​
anybody can help me i cant
4. Dice Marti que «otro peligro» amenaza a «Nuestra América». ¿Cuál es este peligro? ¿A qué se refiere Martí al usar el término «Nuestra América»? 5. Afirma Mar