ANAi3tzenaawe1stor ANAi3tzenaawe1stor
  • 16-01-2017
  • Mathematics
contestada

A construction crew has just built a new road. it took them 7 weeks to build 8.75 kilometers of road. at what rate did they build the road?

Respuesta :

Аноним Аноним
  • 16-01-2017
7 weeks = 8.75

1 week = x

where x is the kilometers of road built in a week

Proportion:

8.75/7 = x/1

7x=8.75

x=1.25
Answer Link

Otras preguntas

A rectangle has a widt
Which fee pays for search of public documents, surveys, and court records in order to determine ownership of a home? A) attorney and notary fees B) Credit check
Help please ASAP quickly
4. Which sentence contains a linking verb? Ellen could have chased the hockey puck into the corner. The children are playing hockey on the frozen pond. Coach To
How did the invention of steamboat in the early 1800s promote economic development in Georgia
What is the base five representation of The number 219
Cultural ___ occurs when cultural and systemic power differences are ignored.
Write a slope-intercept equation for how much money John has when he begins with $750.00. He is spending $95.00 per week
uhammad, a shipping and receiving clerk, uses 1 yard, 2 feet, 4 inches of twine to wrap each carton he packs. He has to pack 29 cartons today. How much twine wi
Two solutions namely, 500 ml of 0.50 m hcl and 500 ml of 0.50 m naoh at the same temperature of 21.6 are mixed in a constant-pressure calorimeter. the heat capa