If 6 men finish a piece of work in 8 days, how long will it rake 4 men to​

Respuesta :

prasamsharayamajhi
prasamsharayamajhi prasamsharayamajhi
  • 16-01-2022

Answer:

6 men finish a piece of work in 8 days

1 men finish a piece of work in 8*6 days

4men will finish a piece of work in 48/4

days

..

which is equal to 12 days

Answer Link
aamtally
aamtally aamtally
  • 16-01-2022
6 men working 8days = 48man days
So if 4men were to do same work then=48/4 =12 days
So it takes 12 days
Answer Link

Otras preguntas

Which branch are appointed
What 14 divided by 17?
Tell wether 24 is a factor or a multiple of 36
A relationship between a producer and consumer is best illustrated by a
Muscles directly cause A. the release of hormones. B. the regeneration of nerves. C. the extension of limbs. D. the healing of wounds.
Tory practiced her basketball shots for 2/3 hour. Tim practiced his basketball shot 3/4 as much time as Tory did. How long did Tim practice his basketball shots
Which of the following is not a technology that can be used to conserve resources? a. hydropower b. volcanic power c. natural gas d. geothermal
Rahul has a loan of 7000 dollars. He pays 2% per month compound interest. How much will he pay if he has the loan for two months Please include the formula to t
A cheetah can cover 50 yards in 5⁄2 seconds. How long will it take a cheetah at the same speed run 80 yards
Select the word that would best complete this sentence: It seems like all of Earth's unique qualities and dynamic processes are _____. unusual interconnected ex