lemogang63587 lemogang63587
  • 15-01-2022
  • Mathematics
contestada

It takes 6 workers 8 hours to tile a hall . How long will it take 4 workers to complete the same job

Respuesta :

icandoitjwk icandoitjwk
  • 15-01-2022
6w=8
2w=8/3

So
4w=8/3x2
4w=16/3
Answer Link

Otras preguntas

Monthly private school tuition based on the average number of weeks in attendance is predicted using the least-square regression line, ŷ = 265.9 + 93.4x, where
Triangle MNO is similar to triangle RPO. Triangle M N O. Side M N is 20 kilometers and side M O is 32 kilometers. Triangle R P O. Side O R is 48 kilometers. Val
A producer gets energy from ______ and converts it into food A. secondary consumers OB. the Sun C. primary consumers D. dead organic matter
Which is a heterogeneous mixture? a mug of hot cocoa a glass of tap water a gallon of milk a jar of mixed nuts
(-6 - 4) = (-5) = Whats the Anwser
Find the product (n-6)(3n-6)
The Kwok Company’s inventory balance on December 31, 2021, was $215,000 (based on a 12/31/2021 physical count) before considering the following transactions: 1
(x+4)^2=9 x=? help please!
Systems of Equations via EliminationRich bought 4 ice cream cones for his kids. Thechocolate cones cost $1.75 each. Thestrawberry cones cost $1.30 each. Rich sp
Determine which ordered pair is a solution of y = -5x + 10. (-15,5) (-1,-5) (3,25) (2,0)