abelmulugeta19 abelmulugeta19
  • 11-10-2021
  • Computers and Technology
contestada

consider 4 jobs arriving in ready queue in the same order at time =0 if BT requirements of these jobs are 4,1,8,1 respectively what is completion time of p1 assuming round robin with TQ =1

Respuesta :

marietavukadinovic marietavukadinovic
  • 11-10-2021

Answer:tq we

Explanation:

t rhh

Answer Link

Otras preguntas

solve the equation -1/3m-7=5
Kate made a box to hold her jewelry collection. She used 42 inches of wood to build the sides of the box. If the box was 9 Inches wide, how long was the box
I need to write a speech analyzing feminism in society. has to have an argument to it with good points
what happened when bob ewell saw tom and mayella? in to kill a mocking bird
what would my final balance be if i put $650 in the bank for 60 months with an interest rate of 6%
A forester is making a gasoline-oil mixture for a chainsaw engine. The forester has 2 gallons of a mixture that is 29 parts gasoline and 1 part oil. How many ga
Choose the less precise measurement and explain why it is less precise. 2.8 mm or 3.79 mm
What are some key factors that led to WWI
At the time of the Civil War, the South could be described as urban and the North as pastoral.  true false
What is the rate at which food is converted to energy and expended by the body?