elizabethmorladza
elizabethmorladza elizabethmorladza
  • 01-09-2021
  • Mathematics
contestada

A piece of work takes 20 labourers to complete in 10 days. how many labourers will complete the same job in 25 days if they work at the same rate?​

Respuesta :

denimjackets23
denimjackets23 denimjackets23
  • 04-09-2021

Step-by-step explanation:

If 20 labourers=10 days

x labourers = 25 days

10x= 25×20

[tex] \frac{10x}{10} = \frac{25 \times 20}{10}[/tex]

Cancelling out by 10 on both sides

[tex]x = \frac{25 \times 2}{1} \\ x = 50 [/tex]

Therefore, it takes 50 labourers to complete the work at the same rate in 25 days.

Answer Link

Otras preguntas

what were the cultural exchanges between the native American civilizations and the European settlers?
what is the equivalent to 7.4 kilograms
Find the difference: 7 7/8 - 3 1/4=?
Why did the Spanish explore and colonize New Mexico and Florida in the 1600s?
round 76340 to the nearest thousand
A sample of helium gas is in a sealed, rigid container. What occurs as the temperature of the sample is increased?
6. All of the following changes occurred in China between 1500 and 1800 except (1point) A. An increase in population B. Growth in manufacturing and trade C. Imp
How many different 4-digit numbers can be formed using the digits 2, 4, 5, 6, and 7 such that no digits repeat and the number is divisible by four?
9. What is the setting of "The Little Match Girl"? A. A wintry city street B. A place in the matchseller's imagination C. The matchseller's attic home D. The ma
Which statement describes the general trends in electronegativity and first ionization energy as the elements in Period 3 are considered in order from Na to Cl?