If you want to give a vendor an incentive to complete work early which type of contract would you use?

Respuesta :

kaisersriprad
kaisersriprad kaisersriprad
  • 14-03-2021

Answer:

Time and Materials Contract

Explanation:

A time-and-materials contract may be used only when it is not possible at the time of placing the contract to estimate accurately the extent or duration of the work or to anticipate costs with any reasonable degree of confidence.

Answer Link

Otras preguntas

helppppppp plszzzz!!!!!!!
2 3 4 cups of oatmeal and makes one dozen muffins. If he makes 3 dozen muffins for a club meeting and 2 1 2 dozen muffins for a family reunion, how much oatmeal
how do you know when its time to run from your residential?
Which expression is equivalent to 4/9 (2n-3)
Which situation can be represented by the equation Y equals 74X
What is the purpose of control rods in a nuclear reactor, and how can their malfunction lead to meltdown?
metaphors that compare to life
A drone travels 180 kilometers in the same time a bird travels 120 kilometers. If the drone's speed is 20 km/hr faster than the bird, find the speed of each.​
Which of the following is true about Earth's supplies of freshwater? a. Most liquid freshwater is stored in rivers and lakes. b. Groundwater is a significant re
Describe the factors that led people to form the counterculture movement, and what factors led to its decline