sumeirahaseen28 sumeirahaseen28
  • 14-02-2021
  • Chemistry
contestada

Calculate the amount of work done in lifting a heavy load of 50kg up to the height of 3m?

Respuesta :

laisianaturaga
laisianaturaga laisianaturaga
  • 14-02-2021

amount of work done is equal to l/h

so 50/3=16.66667

round your ans to 2 significant figure

so your ans will be 17m/kg

Answer Link
jess9442 jess9442
  • 14-02-2021
have to find the lift which would be 50kg times 9.8N/kg which would give you 490N. the formula for work is force times distance. so 490N times 3m= 1470J
Answer Link

Otras preguntas

Help help help Help help
How was the dollar affected when the U.S adopted the gold standard?
Which fraction is equal to 1518?
What is a therapuetic modality in psychology?
Miguel was asked to improve his company's report format. Many employees and clients found the reports hard so read. To increase readability, he used. shorter li
All the populations of organisms that live in an area a Population b Community c Species d Family
answer this question for the brainliest answer (question 8)
1. How many square cm are in 1 square m? Same with 1m^3
The solution to the system is (6,2). Select all the equations that could be the other equation in the system. A y=−3x B y=−3/2x+6y C y=−1/6x+3y D y=2/3x−1y E y
One of the benefits inherent in describing the life cycle of a family is the fact that most depictions of the life cycle of a family are stage theories and are