leila839 leila839
  • 03-02-2021
  • Mathematics
contestada

Q11.
It takes 3 painters 2 days to complete a job. Work out how long 1 painter would take.

Respuesta :

26liujiaying
26liujiaying 26liujiaying
  • 03-02-2021

Answer:

6

Step-by-step explanation:

1 painter is 1/3 of 3 painters, so the answer is 2 x 3=6

Hope I helped!

Answer Link

Otras preguntas

Consider the right triangle below. A right triangle with a hypotenuse with length 6.5 feet, and side lengths of 2.5 feet and 6 feet. What is the perimeter and a
A number is greater than 8. The same number is less than 10. The inequalities x greater-than 8 and x less-than 10 represent the situation. Which best explains t
Which of the following statements is true of cones?
Mr.O’Donnell bought 3 shirts for x dollars. He also bought shoes for $100. If he spent $160, how much did each shirt cost
Place these in order from broadest to most specific: A) Fresh water; B) Earth's water; C) Clean Drinking Water
solve for x to the nearest tenth I WILL MARK BRAINLIEST.
connected to the left side of the heart, carry blood full of oxygen to the rest of the body. Ventricles Arteries Veins connected to the right side of the heart
What was one result of the Slave Trade Compromise, reached during the 1787 Constitutional Convention?
Write an apology to your friend (it doesn't have to be your friend it can be anyone)
can someone help me with this?? Your presentation should do the following: 1. Explain the risks of using alcohol, tobacco, or illegal drugs, including how thei