how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

subtract \frac{3n+2}{n-4}-\frac{n-6}{n+4}
Review the story event. The narrator and his brother drop the soap cake into the tub of fish in "The Strangers that came to town" Which best identifies the elem
Does shakespeare seem to consider a self-destructive tendency inextricably connected with love, or is it a separate issue?
________ were important to native american cultures because they granted insight and wisdom.
A _____ is an urban area consisting of at least two metropolises and their many suburbs.
People heard a cough or a tone replace the first "s" in the word legislatures. what conclusion did the result support?​
Alex laughed a ball into air the height of the ball can be represented by the equation h=-8t +40t+5, where h is the height in units,and t is the time ,in second
$21000 at 13.6% compounded quarterly for 4 years
what contributions to America independence were made by military leaders and statesmen?
Of the two functional areas of the blastocyst, the three primary germ layers form from the ________.