dalameddin dalameddin
  • 14-09-2020
  • Health
contestada

Typically, what is the first area to be cut when a project goes over budget?

Respuesta :

Bitkoy
Bitkoy Bitkoy
  • 14-09-2020

Answer:

Sometimes depends on what project.

They should cut off the unnecessary people.

Answer Link

Otras preguntas

Pleassssssssseeeeeee heeeelllllpppppp
Find the average rate of change of the function f(x) = x² + 9x from x1 = 1 to x2 = 5.
Which punctuation correctly completes the sentence
The life of an electric component has an exponential distribution with a mean of 8.9 years. What is the probability that a randomly selected one such component
What type of land arabia is ?
The storage of carbon dioxide Question Dro. in the ocean is an example of an interaction between: A: hydrosphere and lithosphere B: lithosphere and atmosphere
Which aspects of a story best help the reader understand the author’s purpose? Select three options
Refer to the example about diatomic gases A and B in the text to do problems 20-28. It was determined that 1 mole of B2 is needed to react with 3 moles of A2. H
?What are the key traits of fascism?
In "The Chrysanthemums," the character of Elisa is different at the end of the story than she is at the beginning of the story. Describe Elisa as she is charact