contestada

The Three Common Constraints on a Project are Scope, Budget and Time.
Ο Τ.
T True
O F.
False

Respuesta :

mjamesbond2016
mjamesbond2016 mjamesbond2016
  • 11-09-2020

Answer:

true

Explanation:

Scope, budget and time are part of the triple constraint theory aka the Iron triangle in management

Answer Link

Otras preguntas

Which figure must be a square? A. a quadrilateral with four right angles B. a rhombus with four right angles C. a parallelogram with four congruent sides D
The suspension of moral beliefs to commit deviant acts is a a. deviance. c. secondary deviance. b. stigma. d. technique of neutralization.
George Washington Bridge interesting facts
Fred is working in the garage and needs to power an extra light to work on a project that requires him to use many sharp tools. The only outlet that is not in u
what is 14/49 as a decimal
A flagpole casts a shadow 27 feet long . A person standing nearby nearly casts a shadow 8 feet long . If the person is 6 feet tall , how tall is the flagpole
What can be inferred from this passage? When babies are born, their brains are not yet fully developed. This is because if babies were able to process everythin
multiply 12 by the sum of 8 and "t"
Select all that apply. Which statements are supported by the second law of thermodynamics?
Which sentence uses possessive personal pronouns correctly? A. Write you're full address in the space beneath your name. B. Under the couch, the cat found i