jeevenjoji2007
jeevenjoji2007 jeevenjoji2007
  • 01-09-2020
  • Mathematics
contestada

if 12 people can finish a job by 5 days how many days will be required finish the same job by 10 people

Respuesta :

ishashunnny
ishashunnny ishashunnny
  • 01-09-2020

Answer:

4

Step-by-step explanation:

12p=5d

1p=5/12

10p=4.1666

≈4 days

Answer Link

Otras preguntas

In △ABC, m∠A=35°, a=8, and b=10. Find c to the nearest tenth
Examples of hyperbole in George Orwell's 1984? *page numbers cited if possible* Thanks in advance :)
Muscular strength is a more important fitness factor than muscular endurance. true or false?
Geometry math question no Guessing and Please show work
Help anyone please and thx
Which lslamic empire controlled territory in Europe during the early modern era?
Assume there are 120 million passenger cars in the united states and the average fuel consumption is 20 mi/gal of gasoline. if the average distance traveled by
how do you simply equations?
A father is 60 years old and his son is half his age. How old was the boy when his father was four times his age? 6 years old 7 years old 8 years old 9 years ol
Point X is located at (2, 4), and Y is located at (-6, 10). Find the y value of the point that lies halfway between X and Y. (5 points) 2 7 -3 -8