nioamicastro
nioamicastro nioamicastro
  • 15-05-2020
  • Physics
contestada

how much work is needed to lift a barbell that has a weight of 445 N a total of 2 meters off ground

Respuesta :

PiaDeveau PiaDeveau
  • 20-05-2020

Answer:

Total work done to lift barbell = 890 J

Explanation:

Given:

Weight of barbell (F) = 445 N

Height (Distance) = 2 meter

Find:

Total work done to lift barbell = ?

Computation:

⇒ Work = Force(F) × Distance

⇒ Total work done to lift barbell = Weight of barbell × Distance

⇒ Total work done to lift barbell = 445 N × 2 meter

⇒ Total work done to lift barbell = 890 J

Answer Link

Otras preguntas

How long have you been here on this sit
Which algebraic expression is a polynomial with a degree of 2? 4x3 − 2x 10x2 − StartRoot x EndRoot 8x3+ StartFraction 5 Over x EndFraction + 3 6x2 − 6x + 5
urgent ..algorithm and flowchart to check weather a number is odd or even ???​
Please help. I’ll mark you as brainliest if correct!
Five times a number is divided by $7$ more than the number. If the result is $2$, then what was the original number? please help!
Please help. I’ll mark you as brainliest if correct!
A man walking on a railroad bridge is 2/5 of the way along the bridge when he notices a train at a distance approaching at the constant rate of 45 mph . The man
How many community lifelines are there? A. 3 B. 9 C. 7 D. 5
It is urgent plz answer
Anne finally goes to the window because A: : . She knows in her heart that it really is Mr Elliot. B: C: D: E: she wishes to prove Mary wrong. She wishes to cal