A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

What is author's purpose
whom are the witches preparing to meet in scene 3 of macbeth?
A recessive allele t is responsible for a condition called distonia. A man who has this condition marries a woman who doesn't. One of their four children has th
7/8+1/4= add write each sum in simplest form?
What does it mean to be as blue as the deepest ocean? a. very soft (The cover of my new book is as soft as velvet) b. completely blue (Her piercing eyes were as
What body of water separates Europe and Asia?
Richard M. Nixon a. President #32 b. President #37 c. President #3 d. President #38
what is special about nitrogen, and what is its main function in the atmosphere
A line passing through which of the following pairs of coordinates represents a proportional relationship? (1, 2) and (2, 3) (1, 3) and (3, 6) (1, 1
A red string of lights blinks once every 3 seconds while a string of blue lights blink once every 4 seconds. How many times will both sets of lights blink at th