dejuancolvin4 dejuancolvin4
  • 12-02-2020
  • Mathematics
contestada

A construction company can remove 1/4 metric tons of dirt from a construction site in 1/8 hours. What is the unit rate in metric tons per hour?

Respuesta :

stargrace1221
stargrace1221 stargrace1221
  • 12-02-2020

2 metric tons per hour.

Answer Link

Otras preguntas

What tactic, involving a work stoppage, do unions use to force employers to address their demands? mediation arbitration strikes collective bargaining?
PLEASE help me with this (I beg): Write the following as an algebraic expression: a) In a party decorations total (R) balloons were used. There were (B) blue ba
Common obstacles or barriers of successful problem solving include all of the following except __________.A.inferring unnecessary constraintsB.ignoring irreleva
the fail rate for taking a bar exam in Philadelphia is 41% if 375 people take the bar exam, what is the mean for the number of failures
before the industrial revolution workers had to represent and protect what?
What most often gives away liars? inconsistencies in the things they say nonverbal behaviors personal confessions none of these; liars are very hard to detect?
When the ph ________, a state of acidosis exists. when the ph ________, a state of acidosis exists. falls below 6.5 falls below 7.35 falls below 7 rises above 7
Can someone help me answer all the questions?
BRAINLIEST! what is tool or equipment used to produce other goods. Example: a printing press, a lathe, a blast furnace
Italia spent 3/4 of this week's allowance on candy. Of the money she spent on candy, 5/6 was spent on gummy bears. What fraction of this week's allowance did Ta