When a business must decide between completing a project that is over budget and past due versus starting over, they are evaluating what?

Respuesta :

ekeneizuka ekeneizuka
  • 15-01-2020

Answer: Sunk cost effect.

Explanation:

The business would consider the sunk cost in the already existing project. The sunk cost effect explains that individuals would have a stronger desire to complete a project that so much resources has entered into, than starting over.

Answer Link

Otras preguntas

what is -(3a+2)-3(5a+7)
Which of the following are examples of a firm experiencing positive technology change?a. A firm is able to cut each workers wage rate by 10% and still produce t
under condition does the addition of two simple harmonic motion produce a resultant which is also simple harmonic
Consider the plot of f(x) = 10ˣ. Write the equation of line l.a) y = 10xb) y = 10ˣ+¹c) y = log(base 10)(x)d) y = log(base 10)(10x)
Help. People have j been submitting blank answers and not helping
A tariff is a type of what??
write the equation of the line with slope 4 that passes through the point (3.5,5) in slope- intercept.​
-8d +20 with a factor of -4
To go on a summer trip, Eric borrows $800. He makes no payments until the end of 4 years, when he pays off the entire loan. The lender charges simple interest a
Function f is represented by f(x) = 5x+10Find f(-3)Find the value of x such that f(x) = 90 is true