riss36 riss36
  • 13-09-2019
  • Engineering
contestada

What are the four basic parts of process plan

Respuesta :

zurimiyah
zurimiyah zurimiyah
  • 06-11-2020

Answer:

Establish objectives.

Analyze the situation.

Determine alternatives.

Evaluate alternatives.

Explanation:

Happy i could help

Answer Link

Otras preguntas

Triangle ABC is an isosceles triangle in which AB = AC. What is the perimeter of △ABC? 5 + square root of 10 units 3x square root of units 10 + square root of
Convert 15/50 into a fraction
Compare the graphs of the inverse variations. Please provide at least 3 comparisons y= -.02/x y=-.03/x Help!
Help me please And I'll do the same
ABC has vertices A(–3, –4), B(1, 5), and C(4,1). ABC is translated so that B’ is located at point (–3, 2). State the coordinates of A’ and C’, where ABC is the
Why did some residents in new netherland welcome the british takeover of their colony?
Help me plzzzzzzz thx
Which statement about electric force is true?
For two events, M and N, P(M)=0.7, P(N|M)=0.3, and P(M'|N')
Light travels 300,000,000 m/s, and one year has approximately 32,000,000 seconds. a light year is the distance light travels in one year. state the speed in km/