usiffat61381 usiffat61381
  • 13-07-2019
  • Computers and Technology
contestada

In its entirety, the CCM process reduces the risk that ANY modifications made to a system result in a compromise to system or data confidentiality, integrity or availability. TRUE or FALSE

Respuesta :

Cetacea
Cetacea Cetacea
  • 25-07-2019

Answer: True

Explanation: CCM process is the process which basically watches over any change or modification that is being made in the data and it will only be implemented when there is no adverse effect of the change.It procedure helps in reducing the risk due to any modification made in data of a system. CCM process also take care of the confidentiality of data and integrity as well and helps inn maintaining it.Therefore the given statement is true.

Answer Link

Otras preguntas

Correct the sentence: what time are we do at miss grissoms recital
What kind of mistake has a scientist made if he accidentally spills a chemical that causes invalid conclusions? Is it a honest mistake or a biased mistake
Write 800 as the product of its prime factors.
what is the sum of zeros of the function y=6x^2-x-2 ?
what does it mean when you have demand for a good or service a.you can afford the good but may be unwilling to buy it. b.you want the good but may not have the
why did Jacques carriers first colony at Montreal fail
Poland, Bulgaria, and Romania were among what ?
Help please Which equations in point-slope form are equations of the line that passes through the point (−7, 5) and (−4, 1)? Choose exactly two answers that are
What contains 15 neutrons and 13 protons?
ken paid $12 for two magazines.The cost of each magazine was a multiple of $3.What are the possible prices of the magazines?