carl105
carl105 carl105
  • 04-04-2016
  • Mathematics
contestada

what is In 7 days, a group of workers can plant 21 acres. What is their rate in acres per day?

Respuesta :

kelpel197
kelpel197 kelpel197
  • 04-04-2016
So do 21/7 to give you how much they do in a day. The answer is three so they do 3 aceres in a day.
Answer Link

Otras preguntas

Geraldine is picking a four-digit password by using the digits 0 through 9. she can use each digit only once. how many different pass words are possible?
On Saturday, Nikki and Tyler walked to the local farmer’s market. Nikki bought 8 apples for $6. Tyler bought 3 fewer apples than Nikki. How much did Tyler spend
PLEASE HELP URGENT THANK YOU
how was Ghana, under the rule of Kwame nkrumah, able to quickly build factories in roads?
Choose a number line to model the following situation: Mandy spent $75 and then earned $75.
For each beaker, identify whether the solution inside was hypotonic, hypertonic, or isotonic in comparison to the control beaker.
Read the sentence and identify the antecedent that corresponds with the bolded pronoun.The roommates moved THEMSELVES into the dorm without any help from their
What part of an hour elapsed between 6:51 pm and 7:27 pm?
If the total area of a picture measuring 10 inches by 12 inches plus a meeting of a uniform width surrounding the picture is 224 square inches, the width of the
How often do you eat genetically modified foods? Check each food you have eaten in the last week that was not organic. Check all that apply. processed cereal so