Which term describes the complexity of a document

Respuesta :

narstarolor
narstarolor narstarolor
  • 06-11-2020

Answer:

Work breakdown structure (WbS)

Explanation:

A work-breakdown structure in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections, and also defines its complexity.

Please let me know if this helped

Answer Link

Otras preguntas

Please help me with this, thank you
What is 1/4 divided by 3 ? I really need help !!!
Y-3=4(x-6) in slope form
Pentagon M’N’P’Q’R’ is larger than pentagon MNPQR, because the scale factor is greater than 1. Pentagon M’N’P’Q’R’ is smaller than pentagon MNPQR, because the
If the endoplasmic reticulum were removed from the cell,which organelle would not be able to function properly, and why
Which could you NOT use to compare five actions? A) more B) most C) many
what is the solution to the equation (-22 = z/-3)
at 4 pm charlie realizes he has half an hour to get to his grandmother's house for dinner? if his grandmother lives 40 miles away, how fast will charlie have to
Is y=6x a liner equation
A satellite was in two separate crashes. In both crashes, the satellite had the same mass. Engineers want to know about the speed and direction of the satellite