aleasee827 aleasee827
  • 12-02-2024
  • Engineering
contestada

For a slab placed below grade, it is necessary to provide at least 4" of crushed gravel or stone. This should be compacted. It will prevent moisture from collecting under the slab. This 4" area is known as ________________________.
A) a base layer
B) subgrade
C) drainage layer
D) subbase

Respuesta :

Otras preguntas

How would write an equation of a regression line?
Which word in the sentence is the predicate nominative? Houston is the largest city in the state of Texas. a. city b. state c. Houston d. Texas
whats 3.25 repeating as a fraction
6.88 written as a percent
50/117 in simplest form
If you deposit $800 in a savings account that earns simple interest at a pate of 1.5% per year, how much interest will you have earned after 5 years?
Find the unit rate of 135 miles in 5 hours
Sarah's craft project uses pieces of yarn that are 1/8 yard long she has a piece of yarn that is 3 yards long how many 1/8 yard pieces can she cut and still hav
Express 14 100 000 in scientific notation
I am a number that is four times the product of 2 and 3. One of my factors is 4. What is my other factor?